At long last, our shower door is being installed tomorrow. After that, it's time to FINALLY call the inspector. 141 days after we began, we will have a stamp of approval (hopefully). We have loved this project; we loved inspecting the construction every day and even had fun down to the little details thanks to such an amazing contractor. Pat Casey, Brock, Cliff the Carpenter, Todd & Steve the electricians, the Drywall Finishers Tweedledum and Tweedledee, those Crown plumbers, even Ernesto and about 9 unnamed installers—we salute you.
Here are some photos of our move-in weekend: At Last
By the way, NO thanks to our hall of shame vendors: Customline Shower Company, Lamps Plus (Should be minus) and the fine folks at A-Boy Supply. Ok, thanks to that one guy at A-Boy who has his stuff together.